Jlg 4394RT Service Manual Bedienungsanleitung Seite 235

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 268
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 234
SECTION 6 - GENERAL ELECTRICAL INFORMATION & SCHEMATICS
3121249 – JLG Lift – 6-3
Continuity Measurement Current Measurement
Figure 6-3. Continuity Measurement Figure 6-4. Current Measurement (DC)
Some meters require a separate button press to
enable audible continuity testing
Circuit power must be turned OFF before testing con-
tinuity
Disconnect component from circuit before testing
Use firm contact with meter leads
First test meter and leads by touching leads together.
Meter should produce an audible alarm, indicating
continuity
Set up the meter for the expected current range
Be sure to connect the meter leads to the correct
jacks for the current range you have selected
If meter is not auto ranging, set it to the correct range
(See multi meter’s operation manual)
Use firm contact with meter leads
Seitenansicht 234
1 2 ... 230 231 232 233 234 235 236 237 238 239 240 ... 267 268

Kommentare zu diesen Handbüchern

Keine Kommentare